SWMS-001 Conduit Installation, Placed Prior to Pouring Concrete

Rev 2

SWMS-002 Conduit Installation, in Ground

Rev 2

SWMS-003 Conduit Installation, Walls and Ceilings

Rev 2

SWMS-005 Using Portable Ladders

Rev 2

SWMS-006 Installing Light Fittings

Rev 2

SWMS-007 Installation of Switchboards

Rev 2

SWMS-008 Installation of Lighting Looms

Rev 2

SWMS-009 Installation of Cable Supports

Rev 2

SWMS-010 Installation of Mains

Rev 2

SWMS-011 Installation of Switchboard Connections (New Switchboard)

Rev 2

SWMS-012 Installation of Submains

Rev 2

SWMS-013 Installation of Power and Light Cabling

Rev 2

SWMS-014 Installation of Power Points

Rev 2

SWMS-015 Manual Handling

Rev 2

SWMS-016 Working with Elevated Work Platforms

Rev 2

SWMS-017 Erecting and Using Mobile Scaffolds

Rev 2

SWMS-018 Dismantling Mobile Scaffolds

Rev 2

SWMS-019 Working at Heights

Rev 2

SWMS-020 Installation of New Work in Existing Switchboards (Not Live Work)

Rev 2

SWMS-021 Working in Risers

Rev 2

SWMS-022 Installation of Pyrotenax, (MIMS) Cable

Rev 2

SWMS-023 Isolation and Testing of Energy Sources

Rev 2

SWMS-024 Installation of Equipment Racks

Rev 2

SWMS-025 Installation of Fibre Optic Cable

Rev 2

SWMS-026 Installation of Trunk Cabling

Rev 2

SWMS-027 Installation of Outlet Cabling

Rev 2

SWMS-028 Installation of Outlets

Rev 2

SWMS-029 Working on Energised Low Voltage Equipment / Apparatus

Rev 2

SWMS-030 Installing Ceiling Mounted Lights and Speakers

Rev 2

SWMS-031 Installation of New Racks and Cabinets

Rev 2

SWMS-032 Heat Shrink Cable Joints and Lugs

Rev 2

SWMS-033 Installation of SELV Cabling (Data/security/nurse Call Etc)

Rev 2

SWMS-034 Installation of Data, TV, Nurse Call Points

Rev 2

SWMS-035 Installing Light Poles

Rev 2

SWMS-036 Trenching with a Small Excavator

Rev 2

SWMS-037 Installation of Grid Connected Photovoltaic System

Rev 2

SWMS-038 Energise and Commission Installation

Rev 2

SWMS-039 Test & Tag Electrical Equipment

Rev 2

SWMS-040 Working with Asbestos

Rev 2

SWMS-041 Thermography

Rev 2

SWMS-042 Demolition and Dismantling

Rev 2

SWMS-043 Fencing

Rev 2

SWMS-044 Working with Power Tools

Rev 2

SWMS-045 Delivery and Erection of Mast Arm Poles & CCTV Poles

Rev 2

SWMS-046 Cable Hauling

Rev 2

SWMS-047 Plant

Rev 2

SWMS-048 Installing and Removing Light Poles

Rev 2

SWMS-049 Working Alone or in Isolation

Rev 2

SWMS-050 Respiratory Protective Equipment - Fit Testing Requirements

Rev 2

SWMS-051 Working with Pneumatic Tools

Rev 2

SWMS-052 Abrasive Wheel and Rotating Machinery

Rev 2

SWMS-053 Working with Powder Actuated Tools

Rev 2

SWMS-054 Arc Flash Safety

Rev 2

SWMS-055 Handling of Refrigerant Gas

Rev 2

SWMS-056 Working in Roof Space

Rev 2

SWMS-057 Concrete Cutting Wet Saw Ring Saw

Rev 2

SWMS-058 Temporary Generator Installation

Rev 2

SWMS-EI Electrical Installations – Power, Lighting and Data

Rev 2